Snagging, Handover & After-Sales

Snag lists, testing, OC, warranties and closing the final account

2 lessons · 24 min · 3 videos · 2 articles

Lessons

Before any unit or building is handed over, a formal snagging exercise is carried out, where the client's team, the contractor and often a third-party snagging consultant walk through every space systematically, room by room, noting every defect — a hairline crack, a misaligned tile, a door that does not close flush, a switch plate that is not level — onto a snag list with photographs, location references and a target rectification date against each item. A good snag list is never a vague verbal complaint; it is a numbered, trackable document, often maintained on a shared spreadsheet or a dedicated snagging app, that both sides sign off on as items get closed, because disputes at handover almost always come down to whose list is considered final and whether closure was actually verified rather than just claimed.

Testing and commissioning runs in parallel with snagging and is arguably more important, because snags are cosmetic while commissioning failures are functional and sometimes safety-critical. Every electrical circuit is tested and megger-tested for insulation resistance, fire alarm and sprinkler systems are tested with the local fire department often required to witness and approve them, lifts are certified by the government lift inspector, Diesel Generator (DG) sets and fire pumps are run under load, and water supply and drainage systems are flow-tested, not just visually inspected. A building cannot be handed over as functionally ready if these systems have only been installed but never actually proven to work under real conditions.

As-built drawings are the record of what was actually constructed, which almost always differs in places from the original design drawings because of site-level changes, client-requested variations, or coordination clashes resolved during execution. These as-built drawings, along with Operation and Maintenance (O&M) manuals for every major system — lifts, DG sets, HVAC (heating, ventilation and air conditioning), fire systems, water treatment plant — must be compiled and handed to the facilities team before occupancy, because without them the facilities team is maintaining a building blind, unable to even locate a buried pipe or a hidden junction box without guesswork.

Warranties from equipment manufacturers, from lift companies to waterproofing contractors, need to be collected, compiled and handed over as a single register with start dates, durations and the manufacturer's contact details, because a warranty that exists only as a scattered set of invoices in different files is effectively unusable when something fails two years later and nobody can locate the paperwork in time.

Lift certification authority

Government lift inspector

Electrical test

Megger insulation resistance test

Remember on site

  • A snag list must be numbered, photographed and trackable to closure, not a verbal complaint
  • Commissioning tests (electrical, fire, lifts, DG sets, water flow) prove systems work, unlike snagging which is cosmetic
  • As-built drawings and O&M manuals must be handed to the facilities team before occupancy
  • Compile all warranties into a single register with dates and manufacturer contacts

Check yourself

What is a formal snag list used for?

Why is testing and commissioning considered more critical than snagging in some respects?

Who typically certifies lifts before a building can be occupied?

What does a megger test check on an electrical installation?

Why are as-built drawings different from the original design drawings?

Why must Operation and Maintenance (O&M) manuals be handed over before occupancy?

What should a warranty register for a handed-over building contain?

Why is a DG (diesel generator) set run under load as part of commissioning rather than just visually checked?

Who is often required to witness and approve fire alarm and sprinkler system tests?

Why do handover disputes often arise around snag lists?