Sign in to save & sync
Sign in

Structural steel painting

Surface area from tonnage, primer and finish paint litres

Explanation in

Painting area

0

m²

Area
0 m² (0 ft²)
Primer
0 L (0 US gal)
Finish paint
0 L (0 US gal)

How we got this

  1. 1

    Area

    Formula
    t × m²/t
    Your numbers
    0 × 0
    Answer
    0 m² (0 ft²)
  2. 2

    Primer

    Formula
    A × coats × (1+loss) ÷ coverage
    Your numbers
    0 × 0 × 1 ÷ 0
    Answer
    0 L (0 US gal)
  3. 3

    Finish

    Formula
    A × coats × (1+loss) ÷ coverage
    Your numbers
    0 × 0 × 1 ÷ 0
    Answer
    0 L (0 US gal)

Short forms used above

m²
— Square metre (area)

The theory behind it

Method used: Tonnage × m²/t

Light sections have more surface per tonne than heavy ones. Area = tonnage × m²/t. Litres = area × coats ÷ coverage, increased for application loss. Surface preparation (Sa 2½ blasting or St 3 wire brushing) is measured on the same area.

Assumptions used

  • •m²/t: heavy built-up 15–20, medium ISMB 20–30, light angles/purlins 35–50.
  • •Coverage depends on DFT: zinc-rich primer 75 µm ≈ 6–8 m²/L.

Codes & references

  • IS 1477 — Painting of ferrous metals
  • IS 800:2007 Section 15 — Durability
  • ISO 8501-1 — Surface preparation grades
History

Estimates for guidance only. Confirm quantities with your site engineer.

© 2026 SiteMate. All rights reserved.