How we got this

  1. 1

    Rise

    Formula
    Length ÷ n
    Your numbers
    0 ÷ 0
    Answer
    0 mm (0 in)
  2. 2

    Average

    Formula
    Min + rise/2
    Your numbers
    0 + 0/2
    Answer
    0 mm (0 in)
  3. 3

    Volume

    Formula
    L × B × average
    Your numbers
    0 × 0 × 0
    Answer
    0 m³ (0 ft³)

The theory behind it

Method used: Wedge volume

The screed is thinnest at the outlet and rises by 1 unit for every n units of run. Average thickness = minimum + total rise ÷ 2.

Assumptions used

  • •Roof slopes 1:100 to 1:80; balconies and bathrooms 1:60 to 1:48.

Codes & references

  • IS 3067 — Waterproofing of roofs (lime concrete / brickbat coba)
  • NBC 2016 Part 9