Scaffolding (tube & coupler)

Scaffold area, standards, ledgers and transoms for a facade

Explanation in

Scaffold area

0

m²

Bays × lifts
0 × 0
Standards
2 lines · 0 m (0 ft) total
Ledgers
0 m (0 ft)
Transoms
0 nos
Wall ties
0 nos

How we got this

  1. 1

    Bays

    Formula
    L ÷ bay
    Your numbers
    0 ÷ 0
    Answer
    0
  2. 2

    Lifts

    Formula
    H ÷ lift
    Your numbers
    0 ÷ 0
    Answer
    0
  3. 3

    Standards

    Formula
    (bays + 1) × 2
    Your numbers
    (0 + 1) × 2
    Answer
    2

The theory behind it

Method used: Bays × lifts

Independent scaffolds have two lines of standards (inner and outer) at every bay, ledgers along each lift on both lines, and transoms across each standard pair at every lift. Hire is usually per m² of facade.

Assumptions used

  • •Bay 2–2.5 m, lift 2 m; ties approx. 1 per 32 m² (unclad).

Codes & references

  • IS 3696 (Part 1) — Safety code for scaffolds
  • IS 4014 — Steel tubular scaffolding
History

Estimates for guidance only. Confirm quantities with your site engineer.