Kerb stones

Precast kerbs along road edges and medians

Explanation in

Kerb stones

0

nos

Total run
0 m (0 ft)

How we got this

  1. 1

    Count

    Formula
    Run ÷ unit × (1 + breakage)
    Your numbers
    0 ÷ 0 × 1
    Answer
    0

The theory behind it

Method used: Length ÷ unit

Kerbs are laid end to end on a concrete bed along each edge. Count = total run ÷ unit length plus breakage.

Assumptions used

  • •Precast kerb 500 mm long common; 1000 mm for medians.

Codes & references

  • IRC 86 — Geometric design of urban roads
  • IS 5758 — Precast concrete kerbs
History

Estimates for guidance only. Confirm quantities with your site engineer.