Studs, tracks, boards, screws and joint tape
Boards
0
nos
Studs
Board area
Boards
Method used: Framing + sheeting
A metal stud frame sits in floor and ceiling tracks. Boards are screwed to studs at ~300 mm centres; joints are taped and finished.
Estimates for guidance only. Confirm quantities with your site engineer.
© 2026 SiteMate. All rights reserved.