How we got this

  1. 1

    Studs

    Formula
    L ÷ spacing + 1
    Your numbers
    0 ÷ 0 + 1
    Answer
    0
  2. 2

    Board area

    Formula
    L × H × sides × layers
    Your numbers
    0 × 0 × 0 × 0
    Answer
    0 m² (0 ft²)
  3. 3

    Boards

    Formula
    Area ÷ board × 1.05
    Your numbers
    0 ÷ 0 × 1.05
    Answer
    0

The theory behind it

Method used: Framing + sheeting

A metal stud frame sits in floor and ceiling tracks. Boards are screwed to studs at ~300 mm centres; joints are taped and finished.

Assumptions used

  • •Stud spacing 600 mm (400 mm for tiles or heavy loads).
  • •~27 screws per 1.2 × 2.4 board.
  • •5% board wastage.

Codes & references

  • IS 2095
  • ASTM C754 — Installation of steel framing for gypsum panels
History

Estimates for guidance only. Confirm quantities with your site engineer.