Curing water

Water needed to keep concrete wet for the curing period

Explanation in

Water

0

L

Total water
0 L (0 US gal)
Tanker loads (6000 L)
0 nos

How we got this

  1. 1

    Water

    Formula
    Area × rate × days
    Your numbers
    0 × 0 × 0
    Answer
    0 L (0 US gal)

The theory behind it

Method used: Area × rate × days

IS 456 requires at least 7 days of moist curing for OPC and 10 days for blended cements (PPC/PSC) or hot weather. Ponding uses more water; wet hessian a little less.

Assumptions used

  • •Rate 3–8 L/m²/day depending on weather and method.

Codes & references

  • IS 456:2000 Clause 13.5 — Curing
History

Estimates for guidance only. Confirm quantities with your site engineer.