Cement, sand, aggregate and water for any nominal mix
Explanation in
Cement
0
bags
Grade used
M5 (1 : 5 : 10)
Cement
0 bags · 0 kg (0 lb)
Sand
0 m³ (0 ft³)
Coarse aggregate
0 m³ (0 ft³)
Water
0 L (0 US gal)
How we got this
1
Volume with wastage
Formula
Wet × (1 + wastage)
Your numbers
0 × 1
Answer
0 m³ (0 ft³)
2
Dry volume
Formula
Wet × 1.54
Your numbers
0 × 1.54
Answer
0 m³ (0 ft³)
3
Cement
Formula
Dry × 1/16 ÷ 0.0347
Your numbers
0 ÷ 16 ÷ 0.0347
Answer
0 bags
4
Sand
Formula
Dry × 5/16
Your numbers
Answer
0 m³ (0 ft³)
5
Aggregate
Formula
Dry × 10/16
Your numbers
Answer
0 m³ (0 ft³)
6
Water
Formula
Cement kg × W/C 0.7
Your numbers
0 × 0.7
Answer
0 L (0 US gal)
Short forms used above
W/C
— Water–Cement ratio
Weight of water ÷ weight of cement. Lower = stronger, if workable.
The theory behind it
Method used: Dry-volume method (nominal mix)
Wet concrete shrinks about 54% from the loose dry materials because cement paste fills the voids. So the dry volume = wet × 1.54, which is split in the ratio of the mix. Cement is converted to 50 kg bags. M30 and above must be design mixes from a lab (IS 10262), not nominal ratios.