CC (rigid) road

Pavement quality concrete, joints and dowel bars

Explanation in

PQC concrete

0

m³

PQC
0 m³ (0 ft³)
DLC
0 m³ (0 ft³)
Contraction joints
0 nos
Dowel bars
0 nos
Joint sealing
0 m (0 ft)

How we got this

  1. 1

    PQC

    Formula
    L × W × t
    Your numbers
    0 × 0 × 0
    Answer
    0 m³ (0 ft³)
  2. 2

    Joints

    Formula
    L ÷ spacing − 1
    Your numbers
    0 ÷ 0 − 1
    Answer
    0
  3. 3

    Dowels

    Formula
    Joints × ⌊W ÷ 0.3⌋
    Your numbers
    0 × 0
    Answer
    0

The theory behind it

Method used: Slab volume + joints

Rigid pavements are PQC slabs (M40 flexural) on a Dry Lean Concrete base. Contraction joints are cut every 4.5 m to control cracking; dowel bars at 300 mm transfer load across them.

Assumptions used

  • •Dowels 32–38 mm Ø × 500 mm @ 300 mm c/c (IRC 58).
  • •Longitudinal joint at lane centre with tie bars.

Codes & references

  • IRC 58:2015 — Rigid pavements
  • IRC 15 — Construction of concrete roads
  • IRC SP 62 — Rural concrete roads
History

Estimates for guidance only. Confirm quantities with your site engineer.