Bored cast-in-situ piles

Pile concrete, over-cast and reinforcement

Explanation in

Concrete to order

0

m³

Theoretical
0 m³ (0 ft³)
With over-cast
0 m³ (0 ft³)
Reinforcement
0 t (0 US ton)

How we got this

  1. 1

    Volume

    Formula
    π/4 × D² × L × n
    Your numbers
    0.785 × 0² × 0 × 0
    Answer
    0 m³ (0 ft³)
  2. 2

    Order

    Formula
    × (1 + over)
    Your numbers
    × 1
    Answer
    0 m³ (0 ft³)

The theory behind it

Method used: Cylinder volume

Pile volume = π/4 × D² × L. Bored piles consume extra concrete because the bore is rougher and larger than nominal and the top is over-cast and chipped off.

Assumptions used

  • •Over-consumption 5–15%; steel 80–120 kg/m³ typical.

Codes & references

  • IS 2911 (Part 1/Sec 2) — Bored cast-in-situ piles
  • IRC 78 — Foundations & substructure
History

Estimates for guidance only. Confirm quantities with your site engineer.