Anti-termite treatment

Pre-construction chemical emulsion and concentrate as per IS 6313

Explanation in

Emulsion required

0

L

Trench bottom
0 L (0 US gal)
Trench sides
0 L (0 US gal)
Plinth top
0 L (0 US gal)
External perimeter
0 L (0 US gal)
Concentrate to buy
0 L (0 US gal)

How we got this

  1. 1

    Trench bottom

    Formula
    L × W × 5 L/m²
    Your numbers
    0 × 0 × 5
    Answer
    0 L (0 US gal)
  2. 2

    Trench sides

    Formula
    2 × L × D × 7.5 L/m²
    Your numbers
    2 × 0 × 0 × 7.5
    Answer
    0 L (0 US gal)
  3. 3

    Plinth top

    Formula
    Area × 5 L/m²
    Your numbers
    0 × 5
    Answer
    0 L (0 US gal)
  4. 4

    External perimeter

    Formula
    Length × 7.5 L/m
    Your numbers
    0 × 7.5
    Answer
    0 L (0 US gal)
  5. 5

    Concentrate

    Formula
    Emulsion × target % ÷ concentrate %
    Your numbers
    0 × 0 ÷ 0
    Answer
    0 L (0 US gal)

Short forms used above

m²
— Square metre (area)

The theory behind it

Method used: IS 6313 (Part 2) application rates

Soil under and around the building is soaked with a termiticide emulsion in stages: trench bottom and sides before footings, the plinth fill top before the floor, and along the external walls. Each surface gets a fixed rate in litres.

Assumptions used

  • •Trench bottom 5 L/m², trench sides 7.5 L/m², plinth top 5 L/m², external perimeter 7.5 L per running metre.
  • •Concentrate needed = emulsion × target % ÷ concentrate %.

Codes & references

  • IS 6313 (Part 2):2013 — Anti-termite measures, pre-constructional