Restore my saved BBS
Bring your account copy onto this phone, including Beam BBS with 17 members.
Members in this schedule
Add as many columns, beams, footings or slabs as the job needs. Each one keeps its own sizes and bar details, and the count multiplies its bars into the project total below.
Read a drawing
Upload a structural or architectural sheet — a photo, scan or PDF. It reads the dimension labels, points out mixed or unclear units, and can build the bar schedule members straight from the sheet.
Quick start — tap a typical slab
Fills every box with a standard section — then change only what is different on your drawing.
Design basis
Development length Ld = 49d in tension, 39d in compression. Lap = 54d tension, 41d compression. Cover per IS 456 Table 16.
Slab details
Your own bars
Anything the drawing shows that this member does not generate — a hidden beam bar, a tie, an odd-shaped bar — add it here and it joins the schedule, the weight and the cutting plan.
S1 × 1 — tap a row for the cutting length working
| Mark | Dia | Nos | Cut (m) | kg |
|---|---|---|---|---|
| S1/Bottom main barMain bars — bottom, along 3.60 m spanShape 41 · Straight with 90° hooks at both ends | 10 | 30 | 4.160 | 77.0 |
| S1/Bottom distribution barDistribution bars — bottom, along 4.50 m spanShape 41 · Straight with 90° hooks at both ends | 8 | 18 | 5.032 | 35.8 |
| S1/Top main barTop bars — negative steel over each supportShape 21 · U-shape, two 90° legs turned down | 10 | 60 | 2.160 | 80.0 |
| S1/Top distribution barTop distribution bars over supportsShape 00 · Straight | 8 | 4 | 4.460 | 7.0 |
Diameter-wise steel
| Dia | kg/m | Length | 12 m bars | Weight |
|---|---|---|---|---|
| 8 mm | 0.395 | 108.4 m | 10 | 42.8 kg |
| 10 mm | 0.617 | 254.4 m | 22 | 157.0 kg |
Project total — all 1 member type
| Dia | Length | 12 m bars | Weight |
|---|---|---|---|
| 8 mm | 108.4 m | 10 | 42.8 kg |
| 10 mm | 254.4 m | 22 | 157.0 kg |
Weight member by member
| Member | Qty | Bars | Weight |
|---|---|---|---|
| S1slab | 1 | 4 | 199.9 kg |
Tap any member to open it. This is the sheet to hand over when each member is billed separately.
Cutting plan — how to cut 12 m bars
8 mm — 11 bars of 12 m
offcut 23.6 m (17.9%)
10 mm — 24 bars of 12 m
offcut 33.6 m (11.7%)
Cut the long pieces first, exactly as listed, and the offcut left over is only 30.1 kg of steel across the whole project.